[Cryptech Core] Fwd: CRYPTECH Alpha timetable

Randy Bush randy at psg.com
Mon Apr 20 23:55:57 UTC 2015


> This is way too long. 3-4 months for schematic capture is insane. Have 
> you told them, that we have Novena and Rex modules? One can copy and 
> paste as much as possible and then add an FPGA. Two people working 75% 
> of full time should be able to prepare schematic in less than a month.

that would be ver cheery

> I don't understand case design problem. Can't we use something like
> these? http://www.gainta.com/en/plastic_housing/

don't care about case

randy



More information about the Core mailing list